Changelog
What's new in Excav. We ship improvements most weeks; the biggest ones are listed here.
v0.77November 24, 2026
Security and team controls
- Server-side version history for every job, with restore.
- Coworkers who share your email domain now ask to join, and an owner lets them in.
- Support access only through a logged visit with two-step sign-in, read-only by default, with an owner switch to turn it off.
- Exports to Excel are safe from formula injection.
- Stronger checks on plan-file uploads and processing.
v0.76November 23, 2026
Sign in with Google, teams, one editor at a time
- Sign in with Google or an emailed link.
- Company → Team: owners, estimators and viewers; change roles, take people out, let them back in.
- One person edits a job at a time; others watch it update live and can take over.
- Bring projects saved in your browser up to your company account, plan sets included.
- Cut/Fill: drag and turn a linked sheet to fine-tune how it lines up; sheet arrows on the toolbar.
v0.75November 23, 2026
Field view for the iPad
- A finger-sized layout that turns on by itself on a tablet.
- Tap the 3D model to read cut or fill at a spot; pinch to zoom; hold for the right-click menu.
- Big view puts the panels away so the plans or the model fill the screen.
v0.74November 23, 2026
Road sheets stitched together
- Chain any number of road sheets with no master sheet, lined up by two points or a point and the north arrow.
- Trace an area on any sheet and file it into the area it belongs to.
- Linked areas show on every sheet they cross.
v0.73November 22, 2026
3D layers, round three
- One cursor tag: the grade under the pointer, existing and finished elevations, and the section's courses.
- Every pavement section shown as a box in 3D; line elevations on hover.
- All areas view, each area on its own ground.
v0.72November 22, 2026
Cut/Fill 3D, one area at a time
- A Layers panel: plan set, existing ground and each area's finished grade, each with show/hide and a see-through slider.
- Clean edges and an All areas view.
v0.71November 21, 2026Quantity change
The job model in layers
- Past the last traced proposed line, the finished grade now ties back into existing ground instead of carrying the last contour across the site. Areas whose outlines ran wider than their grading now figure less cut and fill, which is the correct answer. The earlier figure is shown alongside, and step 3 can switch back.
- Plan sheets drawn onto the model, lined up and blended, with existing and proposed traced lines in 3D.