1. Calibrate each sheet
Every sheet is calibrated to its own scale before anything is measured, so a plan at 1" = 40' and a detail at 1" = 10' in the same set both measure true. Areas, lengths and counts are facts from the plans at that scale.
2. Build existing and proposed ground
You trace the existing contours and the proposed contours and spot grades on the grading sheets. Excav builds an existing surface and a proposed surface from those lines. Where the proposed design ends, the grade ties back into existing ground instead of carrying the last contour across the site, so the volumes only come from work the plans show.
3. Compare the surfaces cell by cell
The job is split into small cells. In each one, Excav compares proposed to existing. Where proposed is lower, that cell is cut; where it is higher, it is fill. Depth times cell area gives the volume, and the cells add up to the cut and fill totals. The 3D model is the same comparison drawn: red is cut, blue is fill.
cell volume (CF) = cell area (SF) × (proposed − existing) (FT)
cut = sum of cells where proposed is below existing
fill = sum of cells where proposed is above existing
CY = CF ÷ 274. Take pavement sections off to subgrade
Where an area has a pavement section, the dirt is figured to subgrade: finished grade minus the section depth. The asphalt, base and pit run become their own line items in yards and tons, using the densities you set.
5. Convert bank, compacted and loose yards
Cut comes out of the ground in bank yards. Fill goes back in as compacted yards. To see whether the site balances, compacted fill is converted back to bank yards with your shrink factor. Anything left over is import or export. Hauling is figured in loose yards with your swell factor, then divided by the truck you pick.
Read more in shrink and swell factors explained, or try the shrink and swell calculator.
Why it can differ from the engineer’s number
Areas and lengths measured at scale match what is drawn. Earthwork totals can differ from a printed engineer’s estimate for honest reasons: where the grading is assumed to stop, whether pavement sections are taken off, and which shrink and swell factors are used. Excav shows each of those, so when the numbers differ you can see why and decide.